| Availability: | |
|---|---|
| Quantity: | |
ZSJH STEEL
Specification | Reference options and order details |
Coating system | Specify factory-applied extruded PE and the coating standard, such as EN 14628-1 when specified. |
Base pipe | State DN, quantity and laying length. Typical RFQ lengths include 5.7 m or 6.0 m where available. Specify ISO 2531 or EN 545 for water, or EN 598 or ISO 7186 for sewerage, as required. |
Class and lining | Specify pipe class and lining. C25/C30/C40 are pressure-class examples where specified. Treat K9 as a wall thickness designation and confirm the required standard. |
Coating details | Confirm minimum and nominal coating thickness in mm, coated length and uncoated end lengths at the socket and spigot. |
Burial exposure | Share soil and groundwater data and any route-specific protection requirements. |
Interfaces and acceptance | Confirm joint and fitting protection, repair procedures and required records for coating thickness and continuity. |
Buried water or sewer sections where the drawings call for a factory-applied extruded PE exterior. Confirm the protection system against the project’s soil and groundwater information.
Factory-applied barrier. Extruded PE covers the specified pipe surface. Compare minimum thickness and inspection criteria.
Joint protection planned in advance. Confirm coating termination, fitting protection and approved repairs so the installation team can coordinate the interfaces.
Lining specified for the fluid. Select the internal lining and confirm the lined bore separately from the external PE system.
Quote PE-coated straight pipe. List joint protection materials, coated fittings, repair materials and coating reports if required. Confirm packing for the coated surfaces.
Does a loose PE sleeve meet this specification?
Factory-applied extruded coating and site-installed PE encasement are different protection systems. Quote against the system named in the project specification.
Does the external coating define the internal lining?
Specify the internal lining separately for the fluid conveyed. Check the quote for both the lining and the external coating.
Send the route specification, pipe schedule, coating details, inspection requirements and destination port.
content is empty!