| Availability: | |
|---|---|
| Quantity: | |
ZSJH STEEL
Specification | Reference options and order details |
Base pipe | ERW, LSAW or SSAW welded pipe, subject to the specified standard, outside diameter and wall thickness. Confirm the welding process against the approved pipe schedule. |
Pipe and coating standards | For AWWA-based water projects, specify the pipe standard and coating standard separately. Where required, use AWWA C200 for the pipe and AWWA C213 for the FBE system. Include the required editions. |
Dimensions | Specify outside diameter × wall thickness and fixed or random lengths. Cut lengths can be quoted against the approved pipe schedule, subject to fabrication and shipping limits. |
Pipe ends | Plain or beveled ends can be specified. For field-welded joints, include the bevel detail and the required uncoated length at each end. |
External FBE coating | Specify coating over the pipe body, with the end cutback shown on the drawing. State the required dry film thickness in µm and the acceptance criteria for coating continuity. |
Internal lining | If an internal lining is required, list it separately. Cement mortar and epoxy are options to evaluate against the water service and project requirements. |
Inspection and packing | Specify the required mill test reports, coating thickness records and holiday test reports. Include any requirements for pipe-end protection and measures to protect the coating in transit. |
Pipe dimensions, end preparation, coating thickness and cutback lengths can be specified to suit the approved drawings and project requirements.
Factory-applied FBE covers the specified pipe surface before shipment. For field-welded pipe, the end cutback leaves the required area clear for welding. Include a separate field-joint coating detail so the installation team knows how to restore protection across the weld and adjacent cutback after joining.
Check bends, reducers and other fabricated sections separately. List any fittings, field-joint materials and coating repair kits you want included in the quotation.
Ask for a pipe list that links each item or batch to its dimensions and the inspection reports required by the order. Where specified, coating records should include dry film thickness readings and holiday test results. A holiday test detects discontinuities in the coating. For drinking-water projects, list any local approval requirements for materials in contact with the water.
Send your pipe schedule, application, outside diameter, wall thickness, lengths, quantities, pipe and coating standards, end details, testing requirements and delivery destination. If the coating drawing is still under review, include the current revision and identify the details to be confirmed before ordering.
content is empty!