:sales@zsjhsteelgroup.com          WhatsApp:+86-15122582058
ChatGPT 图像 2026年10月20日 16_57_10-1
You are here: Home » Products » Steel Structure » Structural Supporting Systems » New Energy Factory & Park Steel Buildings

loading

New Energy Factory & Park Steel Buildings

 
New Energy Factory & Park Steel Structure adopts prefabricated steel frame and portal rigid frame design with large span and high load capacity.
 
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

New Energy Factory & Park Steel Structure adopts prefabricated steel frame and portal rigid frame design with large span and high load capacity. Anti-corrosion and weather-resistant, it is widely used in production workshops, warehouses and industrial parks for photovoltaic, wind power, energy storage and hydrogen energy industries. We provide integrated services of design, manufacturing, installation and operation & maintenance.Prefabricated steel structure factory buildings, new energy industrial park steel frameworks, large-span workshop steel structures for new energy enterprises.

Parameter Item

Details

Product Full Name

Prefabricated New Energy Factory & Industrial Park Steel Structure Buildings

Core Product Types

New Energy Production Workshop Steel Structure, Energy Storage Plant Steel Building, Photovoltaic (PV) Module Factory Steel Structure, Lithium Battery Plant Steel Building, Wind Power Equipment Factory Steel Structure, New Energy Industrial Park Supporting Steel Buildings

Core Positioning

Special prefabricated steel structure system for new energy industry factories & parks, 80% factory prefabrication, on-site fast assembly, fully adapted to the special needs of new energy production scenarios

Core Advantages

60% shorter construction cycle than traditional concrete buildings, large clear span, high space utilization, flexible layout, strong load-bearing capacity, anti-corrosion & fireproof performance, reusable, low maintenance cost

Customization Support

Full size, layout, material, load, function, surface treatment customization according to project drawings, production process requirements & local environmental standards

Our New Energy Factory & Park Steel Buildings are customized prefabricated heavy steel frame constructions specially designed for the full new energy industrial chain, covering standalone production workshops, integrated industrial parks, R&D laboratories, storage warehouses, office supporting buildings, containerized energy equipment bases and matching public facilities for renewable energy projects.

We adopt Q355B high-strength low-alloy steel, hot-dip galvanized purlins and anti-corrosion coated steel plates as main raw materials. All primary beams, columns and trusses are prefabricated with millimeter-level precision in factory workshops, then bolt-connected for fast on-site assembly. Every structure complies with international standards including CE, ISO 9001, Eurocode 3 and local wind/snow load codes of target countries.

Parameter Item

Standard Value

Customization Range

Main Clear Span

15m / 20m / 24m / 30m / 36m / 40m / 50m

10m – 80m single span; Multi-span continuous design up to 200m total length

Eave Height

8m / 10m / 12m / 15m / 18m / 24m

6m – 30m

Column Spacing

6m / 7.5m / 9m / 12m

3m – 15m

Main Frame Steel Section

Hot Rolled / Welded H-beam: 200×100mm – 1200×600mm

Customized section size according to load calculation

Steel Wall Thickness

6mm – 30mm

4mm – 60mm thickened customization for heavy load

Crane Load Adaptation

5t / 10t / 20t / 30t / 50t overhead crane

1t – 100t crane beam & support system customization

Floor Live Load

2.0kN/㎡ (Office) / 3.5kN/㎡ (Production) / 5.0kN/㎡ (Warehouse) / 10kN/㎡ (Heavy Equipment)

2.0kN/㎡ – 20kN/㎡ customized

Standard Roof Slope

1:10 / 1:15 / 1:20

1:5 – 1:30 customized slope

Customizable design scope: column-free large span (20–60m), clear height 6–15m, roof pre-reserved PV mounting load structure, explosion-proof & fire-resistant layout for battery/hydrogen workshops, integrated drainage & thermal insulation system. We support full OEM & ODM one-stop service: architectural drawing design, steel component production, packaging, global shipping and technical installation guidance, applicable to all sizes of new energy industrial zones worldwide.

Parameter Item

Details

Main Structural Steel Grade

Q355B / Q235B Hot Rolled Steel Plate / H-beam; Weathering Steel / Stainless Steel 304/316 Optional for High Corrosion / Clean Workshop Scenarios

Secondary Structural Material

Channel Steel, Angle Steel, Square Tube for Purlin, Support, Bracing System; Stainless Steel for Clean Workshop

Enclosure Material

Insulated PU/Rock Wool Sandwich Panel, Color Coated Steel Sheet, Tempered Glass Curtain Wall, ALC Lightweight Panel; Anti-static / Fireproof / Clean Panel for Special Workshops

Manufacturing Process

CNC Cutting, Automatic Submerged Arc Welding, Shot Blasting & Rust Removal, Prefabricated Modular Molding, Pre-punched Installation Holes, Pre-embedded Pipeline Holes

Surface Treatment

Hot-dip Galvanization / Epoxy Zinc-rich Primer + Intermediate Paint + Polyurethane Topcoat; Heavy-duty Anti-corrosion for Coastal/Industrial Environment; Anti-static / Clean Coating for Special Workshops

Connection Method

100% Factory Prefabricated End Plate, On-site High-strength Bolt Connection; Local Auxiliary Welding Allowed, No Large-scale On-site Welding Required

Main building types:

  1. EV lithium battery production workshops

  2. Solar panel & PV equipment manufacturing plants

  3. Wind turbine component processing factories

  4. Green hydrogen electrolyzer & refueling station workshops

  5. Energy storage container integrated parks

  6. New energy parts warehouses & logistics centers

  7. Industrial park comprehensive office & supporting buildings

    Parameter Item

    Standard Value

    Seismic Resistance Grade

    Grade 7 / Grade 8 / Grade 9 Customizable, Meet Global Seismic Design Codes

    Wind Resistance Capacity

    0.5–1.2 kN/㎡ Wind Load, Coastal Enhanced Version ≥ 1.5 kN/㎡

    Fire Resistance Rating

    1h / 2h / 3h Fireproof Coating for Steel Beams & Columns; Wall Panel Fire Rating Class A/B1 Customizable, Meet GB50016, EN13501-1 Standards

    Load Bearing Capacity

    Roof Live Load: 0.5–1.0 kN/㎡; Floor Live Load: 2.0–20 kN/㎡; Customized for Heavy New Energy Equipment & Crane Load

    Snow Load Resistance

    0.3–1.0 kN/㎡, Heavy Snow Area Enhanced Version ≥ 1.5 kN/㎡

    Anti-corrosion Performance

    Hot-dip Galvanized Layer ≥ 85μm, Salt Spray Resistance ≥ 1000 Hours; Heavy-duty Coating for High Corrosion Environment

    Clean & Anti-static Performance

    Optional Anti-static / Dust-free / Clean Panel System, Meet ISO 14644-1 Clean Workshop Standards

    Design Service Lifespan

    50–70 Years Design Life, Adjusted According to Material & Anti-corrosion Treatment

Core Product Advantages

  1. Ultra Large Column-Free Space, Perfect for Heavy New Energy Equipment

    High strength-to-weight steel structure realizes 20–60m wide clear span without intermediate columns, high vertical bearing capacity to support large stamping machines, battery coating lines, wind turbine molds and overhead traveling cranes. Space utilization rate increases by 25–30% vs concrete buildings, flexible for equipment layout and future production line expansion.

  2. Ultra-Fast Prefabricated Construction, Shorten Project Return Cycle

    Over 90% steel components are finished in factory, only bolt assembly on site. A 10,000㎡ new energy workshop can be finished within 3–6 months, cutting construction period by more than half compared with traditional concrete buildings, helping clients put production into operation ahead of schedule and capture market opportunities.

  3. Built-In PV Roof Compatibility, Match Zero-Carbon Factory Demand

    Roof frame structure pre-calculates additional PV panel load during design phase, reserved mounting brackets and wiring channels, no secondary reinforcement needed. Supports large-area rooftop solar power generation, realizing self-power supply for factories and meeting carbon neutrality requirements of new energy industrial parks.

  4. Custom Safety & Anti-Corrosion Treatment for Special New Energy Scenarios

    For lithium battery and hydrogen production workshops, we supply explosion-proof partition steel structures, fire-resistant coated steel frames and hydrogen corrosion-resistant surface treatment. Hot-dip galvanization + multi-layer anti-rust paint ensures 25+ years service life under coastal, humid, high-temperature industrial environments, greatly reducing later maintenance costs.

  5. Low-Carbon Recyclable Material, Align with Green Energy Industrial Standards

    Steel has over 93% recyclability rate, no construction waste during disassembly. When industrial park needs reconstruction or relocation, steel components can be disassembled, transported and reused, fully matching ESG and green factory certification standards of global new energy investors.

  6. Modular Expandable Design, Support Phased Park Construction

    Standardized modular steel units allow clients to build workshops, warehouses and office buildings in phases according to capital and production plans. Extra connection joints are reserved on main frames for later expansion without tearing down original structures, saving secondary construction investment.

  7. Integrated Energy-Saving Envelope System, Reduce Long-Term Operation Cost

    Match high-density rock wool thermal insulation sandwich panels, rainproof drainage system and natural lighting skylights. Stable indoor temperature control cuts factory air conditioning & heating power consumption, lowering daily operation expenditure for large-scale new energy parks.

  8. Full Set International Certification & Complete Technical Documents

    All steel structures pass non-destructive testing (NDT), load bearing and wind resistance simulation tests. We provide full CE certification, structural calculation reports, material test certificates and installation drawings, convenient for overseas project bidding and local government approval.

Wide Application Range

1. Photovoltaic Industry Parks

PV cell production workshops, solar module assembly factories, PV bracket processing plants, raw material storage warehouses, PV power station supporting maintenance buildings.

2. Wind Power Manufacturing Zones

Wind blade production workshops, wind tower processing factories, generator component assembly plants, wind equipment storage yards and matching office buildings.

3. New Energy Vehicle & Lithium Battery Industrial Parks

Power battery production workshops, battery pack assembly workshops, new energy vehicle assembly plants, battery testing laboratories, chemical raw material warehouses, explosion-proof auxiliary buildings.

4. Hydrogen Energy Industrial Bases

Alkaline/PEM electrolyzer manufacturing workshops, high-pressure hydrogen equipment assembly plants, hydrogen storage tank processing workshops, hydrogen refueling station equipment test bases.

5. Energy Storage Integrated Industrial Parks

Liquid cooling energy storage cabin production workshops, energy storage system assembly plants, centralized energy storage equipment storage warehouses, intelligent energy management control buildings.

6. Comprehensive New Energy Industrial Park Supporting Facilities

Central logistics warehouse, staff office building, R&D laboratory, raw material finished product storage yard, equipment maintenance workshop, park public service steel structures.

Parameter Item

Details

Standard Installation Method

On-site High-strength Bolt Splicing + Local Auxiliary Welding; Modular Hoisting Installation, No Large-scale On-site Processing Required

Matching Accessories

High-strength Hexagon Bolt, End Plate, Stiffener Plate, Angle Bracket, Connecting Plate, Purlin, Bracing System, Sealing Strip, Waterproof Cap, Clean Workshop Special Accessories

Adapted Foundation Type

Independent Concrete Foundation / Strip Foundation / Pile Foundation; No Complex Foundation Treatment Required, Adapt to Various Terrains & Soil Conditions

Installation Efficiency

10000㎡ New Energy Factory Main Frame Can Be Completed Within 2–3 Weeks On Site, 60% Shorter Than Traditional Cast-in-place Concrete Structures

Maintainability & Reusability

Modular Design, Single Component Can Be Replaced Independently; 80% of the Structure Can Be Disassembled and Reused, Reduce Construction Waste

Special Scenario Adaptation

Fully Adapted to Clean Workshop, Explosion-proof Workshop, Constant Temperature & Humidity Workshop, Dust-free Workshop for New Energy Production

Previous: 
Next: 
Related Products
Related News

Quick Links

Product Category

Other Links

Contact Us
Contact Us
Copyright © 2026 Zhong Sheng Jia He Steel Structure (Tianjin) Co., Ltd. All Rights Reserved.