White-finished structural steel members for a Cambodian industrial factory were dispatched on February 15, 2025. Design through dispatch took 48 days. The dispatch photos follow the steelwork from the staging yard through bundle handling to the container loading area.
Request a Fabrication and Packing Quote
Project | Cambodia Industrial Factory Steelwork |
|---|---|
Project country | Cambodia |
Dispatch date | February 15, 2025 |
Design to dispatch | 48 days |
Image1 Bundle of white factory steel members suspended under lifting slings
The yard photos show long white members grouped in stacks. Other views capture a bundle under lifting slings and steelwork at the container opening. These stages illustrate why shipping dimensions need to be considered together with member geometry. A useful export packing list links the bundle or container number to its member marks and quantities, so the receiving team can identify the expected contents at unloading.
Image2 White factory steel members stacked in bundles before export loading
ZSJH Steel can quote to approved drawings and agree with the buyer on the delivery unit, packing marks and documentation required for receiving. Where finish appearance matters, we can review the specified coating and discuss protection at contact points during bundling and handling. Buyers can also specify whether they need package dimensions, weights, loading photos or a container-level inventory as part of the handover.
Image3 White factory steel bundle at the opening of a shipping container
Share the latest shop drawings or bill of materials, coating specification, delivery destination and any package size limits. If your site needs certain members first, identify them in the request so the packing and loading scope can reflect that priority.