You are here: Home » Projects » Tianjin SEW Structural Steel Fabrication and Erection Case Study

Tianjin SEW Structural Steel Fabrication and Erection Case Study

A closer look at the steel package

The Tianjin SEW project was completed on May 23, 2023, nearly four months after the start of design. For buyers sourcing structural steel, its photographs offer a close look at several points in the delivery chain, from fabricated plate assemblies and coated steel members to bolted connections and erected bays.Request a Fabrication Quote

Project

Tianjin SEW Steel Structure Project

Location

Tianjin, China

Building type

Industrial steel building

Completion date

May 23, 2023

Design to completion

Nearly four months

Stages covered

Design, detailing, fabrication and site erection

Coated structural steel members stacked for the Tianjin SEW project.jpg

Image1 Coated structural steel members stacked for the Tianjin SEW project

Shop fabrication and inspection

Close-up shop photos show stiffener plates, plate joints and connection details. For a fabrication order, the approved shop drawings guide checks on part dimensions, hole positions and overall member geometry. Weld inspection, surface treatment and final checks follow the agreed inspection plan. Specifying inspection records in the purchase scope gives the buyer a basis for reviewing the package before dispatch.

Welded stiffener plate detail on a Tianjin SEW steel member.jpg

Image2 Welded stiffener plate detail on a Tianjin SEW steel member

Bolted connection detail on a Tianjin SEW steel assembly.jpg

Image3 Bolted connection detail on a Tianjin SEW steel assembly

Staging steel for site erection

The project photos show coated members in storage, steel staged near lifting equipment, and frames standing at the site. On similar orders, packing lists can be organized by piece mark and shipments coordinated by erection batch. A shared set of marks helps the site team match the steel, erection drawings and packing list during receiving and staging.

Steel members staged near cranes at the Tianjin SEW site.jpg

Image4 Steel members staged near cranes at the Tianjin SEW site

Erected steel bays with metal decking at the Tianjin SEW project.jpg

Image5 Erected steel bays with metal decking at the Tianjin SEW project

Fabrication services for contractors and steel buyers

ZSJH Steel fabricates beams, columns and other welded assemblies to project drawings. Depending on the order, our scope can include detailing, material procurement, cutting, assembly, welding, surface treatment, inspection, packing and export shipment coordination. Agreeing on the applicable standards, finish and inspection records at RFQ stage makes it easier to compare quotations on the same scope.

Send drawings and a bill of materials

For a fabrication quote, share your drawings or 3D model, bill of materials, steel grades, finish requirements, destination and required delivery date. We can use these details to review the fabrication, inspection, packing and shipment scope.