Steel Fabrication for the Tianjin Foreign Studies University Project

A campus project viewed through its fabricated steelwork

At Tianjin Foreign Studies University, the period from fabrication to project completion was about three months, with completion on May 17, 2024. Workshop photographs show welded steel assemblies with intersecting members, end plates and predrilled connection plates. For steel buyers, these details help explain what to define in a fabrication RFQ before requesting a price.Request a Fabrication Quote

Project

Tianjin Foreign Studies University Campus Construction

Location

Tianjin, China

Building type

Campus building

Completion date

May 17, 2024

Fabrication to completion

About three months

Stages covered

Steel fabrication and site erection

Intersecting steel members fabricated for the Tianjin campus project.jpg

Image1 Intersecting steel members fabricated for the Tianjin campus project

The details that affect fabrication scope

A connection-plate photograph shows rows of holes across a plate between two projecting edges. Another photograph shows multiple steel members meeting in one assembly. For comparable work, the shop needs to know which parts are welded before dispatch, which interfaces are bolted on site and how critical dimensions are defined. These details affect fabrication effort and the size of the assembly offered for shipment.

Drilled connection plate on a steel assembly for the Tianjin campus.jpg

Image2 Drilled connection plate on a steel assembly for the Tianjin campus

Steel assembly end plate in the Tianjin campus fabrication workshop.jpg

Image3 Steel assembly end plate in the Tianjin campus fabrication workshop

Define the inspection and documentation package

ZSJH Steel can fabricate welded assemblies to approved customer drawings and price the requested work by assembly or lot. For repeat orders or multi-lot packages, buyers can specify how drawing revisions, piece marks and inspection records are to be matched. We can review requirements for material certificates, dimensional reports, weld examination and coating records at RFQ stage so the quotation reflects the documentation and inspection scope the buyer needs.

Stacked coated steel members for the Tianjin campus project.jpg

Image4 Stacked coated steel members for the Tianjin campus project

Request a quote for welded steel assemblies

Send the latest drawings, bill of materials, quantities and applicable fabrication standard. Include any tolerances, coating specification, inspection hold points and delivery destination. For a first order, you can also identify a representative assembly for review before pricing the complete package.