At Tianjin Foreign Studies University, the period from fabrication to project completion was about three months, with completion on May 17, 2024. Workshop photographs show welded steel assemblies with intersecting members, end plates and predrilled connection plates. For steel buyers, these details help explain what to define in a fabrication RFQ before requesting a price.Request a Fabrication Quote
Project | Tianjin Foreign Studies University Campus Construction |
|---|---|
Location | Tianjin, China |
Building type | Campus building |
Completion date | May 17, 2024 |
Fabrication to completion | About three months |
Stages covered | Steel fabrication and site erection |
Image1 Intersecting steel members fabricated for the Tianjin campus project
A connection-plate photograph shows rows of holes across a plate between two projecting edges. Another photograph shows multiple steel members meeting in one assembly. For comparable work, the shop needs to know which parts are welded before dispatch, which interfaces are bolted on site and how critical dimensions are defined. These details affect fabrication effort and the size of the assembly offered for shipment.
Image2 Drilled connection plate on a steel assembly for the Tianjin campus
Image3 Steel assembly end plate in the Tianjin campus fabrication workshop
ZSJH Steel can fabricate welded assemblies to approved customer drawings and price the requested work by assembly or lot. For repeat orders or multi-lot packages, buyers can specify how drawing revisions, piece marks and inspection records are to be matched. We can review requirements for material certificates, dimensional reports, weld examination and coating records at RFQ stage so the quotation reflects the documentation and inspection scope the buyer needs.
Image4 Stacked coated steel members for the Tianjin campus project
Send the latest drawings, bill of materials, quantities and applicable fabrication standard. Include any tolerances, coating specification, inspection hold points and delivery destination. For a first order, you can also identify a representative assembly for review before pricing the complete package.