You are here: Home » Projects » Steel Fabrication and Delivery Planning for Volos

Steel Fabrication and Delivery Planning for Volos

This project profile is based on the owner’s enquiry documents. Areas, dimensions and equipment figures describe the proposed development.

ZSJH team beside stacked steel frame members.jpg

Fabricated Steel Frame Members in the Workshop (ZSJHSTEEL shop example)

Project Parameters

Parameter

Owner Requirements and Confirmation Status

Project Location

Volos, Greece. The RFP lists Volos and Thessaloniki as candidate ports.

Building Application

New industrial manufacturing complex with six independent production halls.

Building Area

2,000 m² of production area per hall and 12,000 m² in total. Auxiliary floor area is to be confirmed.

Building Dimensions

Each hall is 100 m long with a 20 m clear width. Eave height is to be confirmed. The 10 m figure is clear hook height.

Clear Span & Bay Spacing

The brief calls for a 20 m clear width per hall and a 6 m column grid. End bays and final grid dimensions are to be confirmed.

Main Components

The owner specifies heavy-duty steel framing for overhead cranes. Sizes and quantities for beams, columns, bracing and runway beams are subject to detailing.

Crane Requirements

One 10 t and two 5 t overhead travelling cranes per hall, 18 in total. Clear hook height is 10 m. The concept section labels a 10 t crane at 20 m. Final rail gauge and crane data are to be confirmed.

Project Specifications

The frame is to accommodate vertical and horizontal crane operating loads. The brief specifies 60 mm polyurethane roof panels, 40 mm wall panels and two powered roller shutters per hall, each with a 6.0 m wide by 6.5 m high clear opening. Design, fabrication, welding and inspection standards are to be confirmed.

Scope of Supply

The RFP seeks an EPC or turnkey proposal covering design, permits, fabrication, equipment procurement, transport, installation, testing and commissioning. ZSJH’s contracted scope is to be confirmed.

Fabrication & Delivery

The RFP is dated 2 November 2026. Actual manufacturing, shipment and installation dates and durations are to be confirmed.

Defining the steel package within the owner’s brief

The owner’s 2 November 2026 RFP seeks an EPC or turnkey proposal for an industrial complex in Volos with 12,000 m² of production area. The six repeat halls lend themselves to one piece-marking and document system, with packages organised by hall and gridline. The proposal should assign responsibility for steel framing, cladding, crane equipment, building services, civil works and site erection, together with local permits, testing and commissioning.

Moving from detailing to fabrication

Before fabrication, the team should freeze piece marks, sections, connection plates and hole patterns against the approved drawings. The review should cover crane runway interfaces, framing around door openings and service supports. Steel grades, connection revisions and member weights should match the bill of materials. The shop examples show a stiffened end detail and staged fabricated members, illustrating how shop drawings translate into physical pieces.

Steel member end plate and stiffeners during fit-up.jpg

Stiffened Steel Connection During Fit-Up (ZSJHSTEEL shop example)

Linking inspection records to shipping packages

The parties can agree on material certificates, dimensional and hole-pattern records, weld inspection, surface protection records and witness points in the inspection plan. The packing list can link bundle numbers to piece marks, quantities and hall assignments. Long members and matching hardware can then be grouped around the receiving sequence. The shop photos illustrate stacked members, timber dunnage and straps. Edge protection, restraint and load plans depend on actual member sizes and shipping conditions.

Stacked steel members with drilled end plates and straps.jpg

Steel Member Staging and Strapping (ZSJHSTEEL shop example)

Bundled round steel members separated by timber dunnage.jpg

Round Steel Member Bundle (ZSJH shop example)

Planning the port route and site handover

The RFP identifies Volos and Thessaloniki as candidate ports. Delivery planning should check the longest and heaviest packages, inland transport to site, unloading equipment and laydown space. The schedule should identify drawing approval, fabrication, inspection release, dispatch, arrival and site handover separately. For ZSJH fabrication, packing, container loading or erection guidance, submit the specification, drawings, bill of materials, destination port and required arrival sequence so the parties can define the work and documentation.

Reddish-brown steel beams secured on a transport skid.jpg

Steel Beam Bundle on a Skid (ZSJHSTEEL shop example)

Visit ZSJHSTEEL to discuss your project.