:sales@zsjhsteelgroup.com          WhatsApp:+86-15122582058
ChatGPT 图像 2026年10月20日 16_57_12-3
You are here: Home » Projects » Steel Fabrication and Container Loading for a Costa Rica Factory

Steel Fabrication and Container Loading for a Costa Rica Factory

A prefabricated factory project in Costa Rica brought together steel detailing, component production and export shipment under ZSJH’s one-stop service. The delivery package included primary beams and sectional columns, roof and wall purlins, ties, bracing and connecting parts. Factory and loading images show how these components were handled as physical supply items for an overseas industrial building.

For this project, drawing design and detailing took 7 days. Fabrication through dispatch took approximately 35 days. The programme was coordinated around the project’s requirements; schedules for other orders depend on their individual scope, drawing approvals and production arrangements.

Project Delivery Information

Parameter

Details

Project

Prefabricated steel factory building

Location

Costa Rica

ZSJH scope

Drawing design and detailing, manufacturing, processing and shipment

Grid dimensions

156 m × 104.25 m

Longitudinal bay spacing

12 m

Transverse grid spacings

29.75 m / 29.75 m / 29.75 m / 15 m

Main materials

Q355B and Q235B

Main columns

66 lower sections + 66 upper sections

Model steel-part net weight

Approximately 445.56 t

Project drawings

262 DWG files

Design and detailing

7 days for this project

Fabrication to dispatch

Approximately 35 days for this project

Turning a Large Model into a Supply Package

The project grid extends 156 m longitudinally and 104.25 m transversely. A 12 m longitudinal bay spacing repeats along the structure, while the transverse grid spacings are 29.75 m, 29.75 m, 29.75 m and 15 m. This scale makes consistent component information important for both factory production and export coordination.

The model’s steel-part net-weight attributes total approximately 445.56 tonnes, comprising about 415.53 tonnes of Q355B and 30.02 tonnes of Q235B. This model quantity provides a reference for the structural supply scope, with the final shipment based on the approved packing list.

The upper and lower main-column sections form 132 pieces across 66 column positions. Roof and wall secondary steelwork includes 1,371 roof-purlin pieces and 910 wall-girt pieces. Separating these component types in the drawings and packing information supports clearer communication between the production and receiving teams.

Costa Rica factory steel frame and purlin model.jpg

Image 1 Costa Rica factory steel frame and purlin model

Costa Rica factory steel frame elevation drawing.jpg

Image 2 Costa Rica factory steel frame elevation drawing

Fabrication Details Visible in the Factory

The videos show steel members laid out in the workshop, welded connection plates, stiffeners and bolt-hole patterns. These details matter because each fabricated member must correspond to its position and connections in the building model. Component marks link the geometry of an individual member to its assembly information.

The project’s 262 DWG drawings include layouts, assembly drawings and part or production drawings. Alongside the Tekla model, they provide the references for cutting, assembly and processing. Q355B is used for much of the main and secondary framing, while Q235B appears in selected tubular ties, round-bar bracing and other components.

ZSJH’s professional team coordinates drawing information with fabrication and dispatch planning, helping buyers discuss the complete steel package through one service team.

Costa Rica factory steel beam stiffener details.jpg

Image 3 Costa Rica factory steel beam stiffener details

Bundling and Container Loading

The loading photographs show grouped steel beams and columns, end plates with bolt holes, protective materials and identification papers. One view captures steelwork being handled in the loading yard, while another shows the components positioned inside an open shipping container. These images document the connection between finished members, handling arrangements and the export delivery package.

For overseas projects, the component list, bundle references and packing documents need to remain aligned. Member dimensions influence grouping and container placement, and the receiving team needs clear information to identify the supplied pieces. Preparing these details before dispatch helps coordinate unloading and subsequent site assembly.

The model and layout drawings provide the wider context for the physical components, showing where the beams, columns, purlins and bracing belong within the factory structure.

Costa Rica factory steel components prepared for container loading.jpg

Image 4 Costa Rica factory steel components prepared for container loading

Costa Rica industrial factory steel beams in workshop.jpg

Image 5 Costa Rica industrial factory steel beams in workshop

One Team from Drawings to Dispatch

ZSJH provides drawing design, detailing, manufacturing, processing and shipment as an integrated service. With more than 20 years of industry experience, the team works with overseas contractors and industrial buyers to coordinate technical information and supply requirements.

The company holds European and American-standard qualifications, including AISC and CE/EN 1090-related certifications, as well as ISO 9001 quality management credentials. Relevant qualification documents are available for procurement review.

02-ZSJH-EN-TUV-WELD-certificates.jpg

Send your factory drawings, required steel components and delivery destination to sales@zsjhsteelgroup.com. ZSJH can discuss the fabrication scope, packing arrangements and a project-specific timeline for your next industrial steel structure order.

Quick Links

Product Category

Other Links

Contact Us
Contact Us
Copyright © 2026 Zhong Sheng Jia He Steel Structure (Tianjin) Co., Ltd. All Rights Reserved.