The Philippines grandstand drawing set illustrates a coordination challenge that begins before shop drawings are issued. The engineering team needs to reconcile the seating and mezzanine levels with the bearing geometry of the sloping steel rafters, the concrete interfaces and the ridge connection.
Project item | Drawing information |
Seating and mezzanine levels | First bleacher top +8.700 m, mezzanine +9.700 m, second bleacher top +13.000 m (S-104) |
Ridge level | +18.866 m relative to drawing datum (S-104, S-117) |
Roof framing and details | Main roof plan S-112. Connection details 1–8 on S-115 through S-117 |
Ridge connection | Detail 8 shows two W30×191 rafters and flange widener plates (S-117) |
Concrete interfaces | Foundation framing and pedestal geometry on S-109, S-113 and S-114 |
Grandstand Sections and Roof Levels
Cross-check the section and elevation levels against the framing plans, then relate the rafters and their supports to the 3D views. At the concrete interfaces, confirm bearing levels and anchorage geometry with the project design team. At the ridge, Detail 8 provides an isometric view and a dimensioned view. Reading them together helps the detailer reconcile the incoming rafter slopes and plate geometry before the parts are released for fabrication.
W30×191 Rafter Ridge Connection Detail
ZSJH Steel combines over 20 years of structural steel manufacturing experience with engineering, detailing and production teams. A comparable detailing scope can include model coordination, connection queries, assembly and part drawings, and a material list tied to drawing revisions.
The company is certified with ISO 9001 quality management system, ISO 3834 welding quality and within the applicable scope, it holds EN 1090 CE certification.If your project has a sloping roof over several levels, share the latest structural drawings, connection responsibility and expected drawing deliverables so we can define the detailing package.